Granite Dynasty in-house fabrication process

Our Process

Consultation to installed, under one roof.

Every project runs through the same four steps — because we fabricate in-house, not through a third party.

In-house fabrication
On-site templating
Installed in five days

The Process

Fabricated in-house. Installed in five days.

We fabricate every slab ourselves rather than outsourcing cutting and polishing. That control is what lets us hold a five-day timeline once templating is complete.

01

Consultation & slab selection

See current stock in person and choose the individual slab for your space.

02

On-site templating

Exact measurements captured in your space, not estimated from drawings.

03

Cutting, edge profiling, polish

Precision fabrication under one roof — stone, equipment, and crew already in place.

04

Installation

Fitted, sealed where needed, and walked through with your care schedule in hand.

Why It Matters

What in-house actually changes.

Faster timelines

No waiting on a third-party fabrication shop’s queue.

Accurate cuts

Templated on-site to your actual space, not a drawing.

One point of contact

The same team from consultation through installation.

Fewer surprises

Issues get caught and resolved in-house, not passed between vendors.

Questions

Frequently asked.

More answers on our FAQ page.

Do you subcontract fabrication?

No — every slab is cut, edge-profiled, and polished at our own facility.

How long does templating take?

A single visit, typically under an hour for most kitchens, once your cabinets or vanity base are installed.

What starts the five-day clock?

The five-day installation timeline begins once on-site templating is complete.

Granite Dynasty kitchen

Granite Dynasty

Natural. Timeless. Enduring.

One team, one facility, one five-day timeline — from your first call to an installed countertop.